Skip to content

Latest commit

 

History

History
33 lines (23 loc) · 1.75 KB

PLAN.md

File metadata and controls

33 lines (23 loc) · 1.75 KB
this_file PLAN.md

Plan

Authority: parent issues/104.md and issues/106.md. Completed work is in CHANGELOG.md. Publication is the controller's (runbook: workspace verification/issue-104/reports/L5-echopy-docs.md, Task 7; D11).

  1. Review of D14. Owner decision D14 adds the fontlab-fontport reference (Apache-2.0, docstrings/signatures only) and removes the reviewed fly.fp exception (d2ed4c1); final-10 passed every gate with it (lock 6395a8f). Needs an X4 scoped review.
  2. Short rebuild after the glyport release candidate. X1 round 7 changes glyport src; after its merge and RC, echopy regenerates shims, then verification/issue-101-ecosystem/evidence/docs-104/final-rebuild.sh must pass every gate and the reviewed lock is committed.

Issue120 current documentation Z5

  • Build current source documentation and verify rendered source plus local browser behavior.
  • Complete whole-branch review, original native acceptance and every remaining publication/distribution gate before promotion.

Issue120 current API refresh Z19

  • Refresh and verify the 705-input producer lock against the latest reviewed App/Glyport source and ordinary archives.
  • Verify complete captured-native identity reconciliation, current API anchors, both search consumers, 64 accessibility views and 28 interaction checks.
  • Keep whole-branch integration, released dependency, native and publication gates open.

Issue120 Z24 frontend notices

Complete the full transitive asset/component inventory, Wordcut dictionary/modules and source-availability proof, TinySegmenter/Clipboard leaf notices, CSS data SVGs, external response variants and whole-site publication gates. Retain all original native, runtime, corpus and release requirements.