Skip to content

Latest commit

 

History

History
45 lines (34 loc) · 1.78 KB

File metadata and controls

45 lines (34 loc) · 1.78 KB

Isolated IEC 61850 Laboratory Checklist

Before connection

  • Use an isolated engineering network with an approved test IED or vendor simulator.
  • Record vendor, model, firmware, IP, MMS port, C# commit, and C++ commit.
  • Confirm no production breaker/process control is reachable.
  • Confirm the intended Phase 4C.1 command uses only the read-only discovery CLI.
  • Start packet capture when permitted.

Read-only request allowlist

Phase 4C.1 discovery may issue only:

  • MMS GetNameList;
  • MMS GetVariableAccessAttributes;
  • MMS GetNamedVariableListAttributes; and
  • MMS Read.

Stop the test if Write, GI, RCB reservation/enable, control, dynamic DataSet mutation, or file-service traffic is observed.

Minimum acceptance run

  1. Build Release with warnings as errors and run repository CTest.
  2. Run three reconnect/discovery cycles against the test target.
  3. Confirm every cycle produces live-ied-model-v1 and a non-empty hierarchy.
  4. Confirm fingerprints are stable when the IED configuration is unchanged.
  5. Export the C# oracle model against the same target/configuration.
  6. Run C#↔C++ parity and review every blocking finding.
  7. Run ten cycles for the primary target vendor.
  8. Exercise a timeout/connection-failure scenario, then confirm a clean reconnect.
  9. Record multi-page GetNameList evidence when the target model is large enough.
  10. Store interop-summary.json, per-cycle models, parity reports, and capture references.

Review gate

Do not mark Phase 4C.1 physically accepted until:

  • the same-target C# parity report has no unexplained blocking finding;
  • warning policy is reviewed;
  • fingerprint stability is demonstrated;
  • reconnect behavior is demonstrated;
  • Windows/MSVC and repository CI pass; and
  • an engineer signs the completed LAB_INTEROP_REPORT_TEMPLATE.md.